Friday, 29 June 2018
Bauxite, Alumina and Aluminum producer Alcoa has entered into a 15-year PPA with Guleslettene Vindpark in Norway (excl. GOs). The company will purchase the entirety of the production, which is predicted to be 710 GWh per year for the 194MW plant owned by BlackRock and operated by Zephyr.
The plant is expected to finish in 2020, and it consists of 47 turbines with a capacity of 4.2 MW each located in the wes...